How to calculate the kitchen rice? A detailed explanation of pricing methods and pit avoidance guide in one article
Recently, the discussion on "delaying rice pricing" in kitchen decoration has become a hot topic in the home furnishing field. Many consumers have doubts about the pricing method when customizing cabinets, especially their understanding of the professional term "Yanmi" is prone to deviations. This article will combine the latest data on the entire network to analyze the calculation method of kitchen rice in detail and provide practical suggestions for avoiding pits.
1. What is the price of delayed rice?
Yanmi is a special unit of measurement in the cabinet industry, referring to the combined pricing method of floor cabinets, countertops and hanging cabinets within a length of 1 meter. Compared with price by piece, price delay is more suitable for budget estimates of the overall kitchen.
Pricing method | Scope of application | Pros and cons |
---|---|---|
Decision of rice | Standard one-line/L-shaped kitchen | Simple calculation but potentially invisible consumption |
Unit cabinet pricing | Special-shaped kitchen space | Accurate and transparent but complex calculations |
2. Specific calculation method for long-term rice
According to industry survey data, 85% of cabinet merchants adopt the following calculation rules:
project | Calculation rules | Price range (yuan/long meter) |
---|---|---|
Basic Rice Price Release | Floor cabinet + countertop + hanging cabinet combination price | 1500-5000 |
Corner processing | According to actual length × 1.5 coefficient | Additional 30% additional fee |
Special accessories | Draw basket/disinfection cabinet separately priced | 500-2000/piece |
3. Analysis of recent hot topics of consumer complaints
According to 187 complaint data received by the Consumer Association within 10 days, there are mainly the following problems in the pricing of the rice:
Complaint Type | Percentage | Typical cases |
---|---|---|
Low price induce signing | 42% | Advertising price only includes basic configuration |
Repeat the angle of rotation | 28% | Repeated charges for overlapping cabinets on both sides |
Forced bundling of accessories | 20% | Must purchase hardware of designated brands |
4. Guide to avoid pits (2023 latest version)
1.Require a detailed quotation: It must include detailed information such as plate brand, hardware model, countertop material, etc.
2.Dual confirmation of measurement: It is recommended to review the actual kitchen size by yourself. If the error exceeds 3%, you can ask for compensation.
3.Beware of the "package trap": The recent popular "9999 yuan all-inclusive package" usually does not include necessary accessories such as drawers and pull-out baskets
4.Pay attention to the latest industry standards: The "Home Customized Service Specifications" implemented in July 2023 stipulates that the corner part is calculated at most 1.3 coefficients
5. Examples of delayed rice calculations for different kitchen layouts
Kitchen type | Floor cabinet length | Actual pricing length | Calculation formula |
---|---|---|---|
One-line shape | 3 meters | 3 extended meters | 3×Unit Price |
L-shaped | 2+1.5 meters | 3.25 extended meters | (2+1.5)×1.3 (angle coefficient) |
U-shaped | 2+2+1 meter | 4.6 extended meters | (2+2+1)×1.2 (double angle coefficient) |
6. Expert advice
1. Priority is given to companies that quote according to the "Home Customization Service Specifications"
2. The recent popular "segmentation" is more transparent: decompose the cabinet into cabinets, door panels, hardware, etc. to separate the price
3. Pay attention to the promotional nodes of e-commerce platforms: Data shows that the average quotation of SEMI during the September Home Decoration Festival dropped by 15-20%.
Through the above structured data analysis, it can be seen that kitchen rice pricing requires comprehensive consideration of spatial layout, material selection and industry specifications. It is recommended that consumers must ask the merchant to provide three-dimensional renderings and detailed bill of materials before signing a contract to protect their rights and interests.
check the details
check the details